Use MATLAB to evaluate
(i) Develop a date sheet and produce a table of values that represents the solar collector area, in acres, needed to supply electric energy for cities with populations of
5000,20000,50000,100000
, and 1000000 . (Based on inthablem 16.29)
(ii) Develop a data sheet that will determine the average monthly cost of operating 215 individual air-conditioning units in a manufacturing facility. (Based on Problem 16.30)